ai data centres and grid balancingeconomyelectricity marketsinfrastructure

AI data-centre demand and pressure on India’s electricity grid

Quick dive

  • AI data centres are adding pressure to power generation and transmission because they can maintain high constant loads and also exhibit rapid demand changes.
  • Grid-India was tasked with studying data-centre electricity demand after regional power committees discussed ramping impacts and compliance with grid-connection requirements.
  • PGCIL estimated that upgrading the North Eastern region’s SCADA/EMS systems would cost about ₹688 crore, up from ₹521 crore, partly because AI-driven demand makes supervisory hardware costlier.
  • Data-centre projects are concentrating in cities such as Hyderabad, Mumbai, Chennai, Visakhapatnam and Delhi-NCR, creating local transmission and final-mile capacity challenges.
  • exam_relevance: tests the concrete grid concepts of base load, ramping, SCADA/EMS, deviation settlement and transmission-cost recovery through the article’s ₹521-to-₹688-crore upgrade estimate.

Full explanation

This explanation is available with full current-affairs access.

Log in to continue