UPSC Previous Year Question | Mains GS3 | 2026

Discuss how the contradiction between ‘rapid infrastructure development’ and ‘disaster-risk reduction’ in ecologically-sensitive areas of India can be managed, with suitable examples. (150 words)

Answer

Introduction

Infrastructure becomes maladaptive when it ignores carrying capacity, hazard maps and ecosystem services in fragile mountains, coasts and islands.

Managing The Trade-Off

- Apply cumulative environmental and disaster-risk assessments, not project-wise clearances alone. - Respect no-go zones, seismic micro-zonation, flood plains and coastal regulation. - Prefer climate-resilient design: slope stabilisation, drainage, elevated roads, early warning and redundant lifelines. - Use nature-based solutions such as wetlands, mangroves and watershed restoration. - Ensure local consultation, transparent EIA and independent compliance audits.

Examples

Himalayan road and hydropower planning must account for landslides, cloudbursts and carrying capacity; mangrove buffers reduce cyclone and storm-surge risk in coastal infrastructure. The Kedarnath and Joshimath experiences show the cost of ignoring geomorphology.

Conclusion

Speed should mean faster risk-informed planning, not faster construction through ecological safeguards.

Keywords

environment; sustainability; risk management; India

Topics: environment, india, risk management, sustainability