UPSC | Prelims GS | 2026
Which pair is correctly matched with NMDC projects?
- Nagarnar — 2.0 MTPA pellet plant
- Kirandul-Jagdalpur — 2.0 MTPA refinery
- Nagarnar — 100 MTPA steel corridor
- Kirandul-Jagdalpur — 53.16 MTPA pellet plant
Answer
Correct Answer
Nagarnar — 2.0 MTPA pellet plant
Explanation
Nagarnar — 2.0 MTPA pellet plant is correct because it matches the source facts. The other options either reverse the figures, confuse two separate institutions or instruments, or introduce a date, threshold or association not stated in the source.
Topics: infrastructure, mining logistics, nagarnar 2.0 mtpa pellet plant, nmdc projects